Friday, March 16, 2007

moving on up

Only another few weeks to go before we move into the new house! Waiting on:
1. the electrician and plumber to finish off which amongst other things means installing the fridge, cooker, solar hot water system, kitchen sink, wash stand, bathtub, pedestal wash basin, range hood
2. the bookshelves and linen press to be made by a contractor
3. the kitchen benchtops to be coated with polyurethane by us, then installed by builder
4. a bit of tiling behind cooker, slow combustion fireplace and in laundry
5. giving the deck and outside walls another coat of oil

Meanwhile, the second building that will have the poolroom and studio/workshop is taking shape. Photos soon.