Friday, December 19, 2008

Jacksville

Things are moving along quickly with the renovations. The concrete was formed up on 14 Dec 2008:



It was poured on 15 Dec 2008:



The dividing wall between the two cabins was formed up on 17 Dec 2008:



The gyprocking began on 19 Dec 2008:

No comments: